Building permits, plans and review times in Paris, Ontario
Paris, Ontario, Canada
Paris building permit reviews use County of Brant. The published review periods apply to complete applications, and work must begin within six months after permit issue.
Key information
Paris building permit reviews use County of Brant. The published review periods apply to complete applications, and work must begin within six months after permit issue.
On this page
Prepare a complete application
A complete file must satisfy zoning and applicable laws and contain all necessary drawings. The applicant is responsible for obtaining approvals from other agencies. Staff can assist with requirements but cannot act as the project designer.
A site plan shows the entire property, dimensions and all existing and proposed structures. Include the well and septic system where present. Site plans are required for projects affecting land area.
Sources: County of Brant: Building permits, plans and review times
Review classes
The County lists 10 business days for houses, additions, renovations, attached garages, small decks and detached structures up to 55 m², tents and signs. Larger decks and detached structures, certain additional units and other Part 9 buildings fall in the 15-day group.
Part 3 buildings generally have a 20-day review, while high buildings, post-disaster buildings and buildings with interconnected floor areas are in the 30-day group. These are complete-application periods, not an estimate from an incomplete first submission.
Sources: County of Brant: Building permits, plans and review times
Common delays and designers
Missing dimensions, poor plans, incomplete septic information and missing or unsigned designer information can delay approval. The source identifies May to September as the highest application volume.
Many non-architect or non-engineer designers need a Building Code Identification Number. A homeowner preparing their own design does not need a BCIN under the stated exception. This does not remove the need for code-compliant plans.
Sources: County of Brant: Building permits, plans and review times
After issue or unauthorized work
Post the permit visibly on site for the duration of construction. Start within six months. A permit may still be revoked if construction stops for more than a year.
Building without required approval can mean doubled permit fees, uncovering finished work for inspections and paying for an engineer or enforcement costs. Contact Building before construction instead of treating retroactive approval as routine.
Sources: County of Brant: Building permits, plans and review times
Quick reference
| Topic | What to know |
|---|---|
| 10 business days | Houses and listed smaller projects |
| 15 business days | Listed larger Part 9 projects |
| 20 business days | Part 3 building group |
| 30 business days | High/post-disaster/interconnected-floor buildings |
| Start work | Within 6 months after issue |
Sources: County of Brant: Building permits, plans and review times
What to do next
- Prepare
Complete drawings, site plan and outside approvals.
- Submit complete file
Match project class and respond to missing information.
- Build with approval
Post the permit and arrange required inspections.
Sources: County of Brant: Building permits, plans and review times
10 useful questions
Do review periods start with any incomplete form?
No. The published times apply to complete applications.
Source: County of Brant: Building permits, plans and review times
Who gets approvals from other agencies?
The applicant is responsible for them.
Source: County of Brant: Building permits, plans and review times
What should the site plan show?
Property dimensions, existing and proposed structures, and well or septic locations where applicable.
Source: County of Brant: Building permits, plans and review times
What period is listed for a house renovation?
Ten business days for a complete application in that group.
Source: County of Brant: Building permits, plans and review times
What period is listed for high buildings?
Thirty business days in the stated group.
Source: County of Brant: Building permits, plans and review times
Can County staff design my project?
No. Staff must not act as the designer.
Source: County of Brant: Building permits, plans and review times
Does a homeowner doing their own design need a BCIN?
The County describes an exception for homeowners preparing their own design.
Source: County of Brant: Building permits, plans and review times
How soon must construction begin?
Within six months after the permit is issued.
Source: County of Brant: Building permits, plans and review times
Must I display the permit?
Yes. Post it visibly on site throughout construction.
Source: County of Brant: Building permits, plans and review times
Can hidden finished work need to be uncovered?
Yes. Unauthorized work may need to be exposed for inspection.
Source: County of Brant: Building permits, plans and review times
Official information and forms
This guide covers Paris, Ontario, Canada, within County of Brant. County-wide services may have offices outside Paris. Brantford is a separate municipality. Fees and active service notices can change. Use the linked official page for the application or latest notice.