Building permits, plans and review times in Paris, Ontario

Paris, Ontario, Canada

Paris building permit reviews use County of Brant. The published review periods apply to complete applications, and work must begin within six months after permit issue.

Key information

Paris building permit reviews use County of Brant. The published review periods apply to complete applications, and work must begin within six months after permit issue.

On this page

Prepare a complete application

A complete file must satisfy zoning and applicable laws and contain all necessary drawings. The applicant is responsible for obtaining approvals from other agencies. Staff can assist with requirements but cannot act as the project designer.

A site plan shows the entire property, dimensions and all existing and proposed structures. Include the well and septic system where present. Site plans are required for projects affecting land area.

Sources: County of Brant: Building permits, plans and review times

Review classes

The County lists 10 business days for houses, additions, renovations, attached garages, small decks and detached structures up to 55 m², tents and signs. Larger decks and detached structures, certain additional units and other Part 9 buildings fall in the 15-day group.

Part 3 buildings generally have a 20-day review, while high buildings, post-disaster buildings and buildings with interconnected floor areas are in the 30-day group. These are complete-application periods, not an estimate from an incomplete first submission.

Sources: County of Brant: Building permits, plans and review times

Common delays and designers

Missing dimensions, poor plans, incomplete septic information and missing or unsigned designer information can delay approval. The source identifies May to September as the highest application volume.

Many non-architect or non-engineer designers need a Building Code Identification Number. A homeowner preparing their own design does not need a BCIN under the stated exception. This does not remove the need for code-compliant plans.

Sources: County of Brant: Building permits, plans and review times

After issue or unauthorized work

Post the permit visibly on site for the duration of construction. Start within six months. A permit may still be revoked if construction stops for more than a year.

Building without required approval can mean doubled permit fees, uncovering finished work for inspections and paying for an engineer or enforcement costs. Contact Building before construction instead of treating retroactive approval as routine.

Sources: County of Brant: Building permits, plans and review times

Quick reference

Building permits, plans and review times in County of Brant. Verified October 14, 2026.
TopicWhat to know
10 business daysHouses and listed smaller projects
15 business daysListed larger Part 9 projects
20 business daysPart 3 building group
30 business daysHigh/post-disaster/interconnected-floor buildings
Start workWithin 6 months after issue

Sources: County of Brant: Building permits, plans and review times

What to do next

Building permits, plans and review times: next steps
  1. Prepare

    Complete drawings, site plan and outside approvals.

  2. Submit complete file

    Match project class and respond to missing information.

  3. Build with approval

    Post the permit and arrange required inspections.

Sources: County of Brant: Building permits, plans and review times

10 useful questions

Do review periods start with any incomplete form?

No. The published times apply to complete applications.

Source: County of Brant: Building permits, plans and review times

Who gets approvals from other agencies?

The applicant is responsible for them.

Source: County of Brant: Building permits, plans and review times

What should the site plan show?

Property dimensions, existing and proposed structures, and well or septic locations where applicable.

Source: County of Brant: Building permits, plans and review times

What period is listed for a house renovation?

Ten business days for a complete application in that group.

Source: County of Brant: Building permits, plans and review times

What period is listed for high buildings?

Thirty business days in the stated group.

Source: County of Brant: Building permits, plans and review times

Can County staff design my project?

No. Staff must not act as the designer.

Source: County of Brant: Building permits, plans and review times

Does a homeowner doing their own design need a BCIN?

The County describes an exception for homeowners preparing their own design.

Source: County of Brant: Building permits, plans and review times

How soon must construction begin?

Within six months after the permit is issued.

Source: County of Brant: Building permits, plans and review times

Must I display the permit?

Yes. Post it visibly on site throughout construction.

Source: County of Brant: Building permits, plans and review times

Can hidden finished work need to be uncovered?

Yes. Unauthorized work may need to be exposed for inspection.

Source: County of Brant: Building permits, plans and review times

Official information and forms

This guide covers Paris, Ontario, Canada, within County of Brant. County-wide services may have offices outside Paris. Brantford is a separate municipality. Fees and active service notices can change. Use the linked official page for the application or latest notice.